Wing Lee Development Construction posts 2025/26 ESG report: emissions -3.6%, first HK$20 million green loan accelerates equipment electrification

Bulletin Express
Jul 28

Wing Lee Development Construction Holdings Limited (Wing Lee Dev) released its 2025/26 ESG report, detailing governance upgrades, quantified environmental results and expanding green-finance initiatives. The report covers the period from 1 April 2025 to 31 March 2026 and the Group’s Hong Kong-based operations.

Governance • Board-level oversight now integrates climate, risk and target-setting; ESG disclosures follow Appendix C2 of HKEX Listing Rules and ISO 14001/ISO 45001/ISO 9001 certified systems. • A full-year materiality review ranked operational compliance, sustainable operations and environmental compliance as top issues.

Environmental performance • Scope 1 emissions 1,145.90 tCO₂e and Scope 2 emissions 119.80 tCO₂e; combined Scope 1+2 fell 3.6% year-on-year to 1,265.70 tCO₂e, or 2.00 tCO₂e per HK$1 million revenue (revenue: HK$620.32 million). • Total energy consumption 4,987.30 MWh (-4.8% YoY), equal to 8.00 MWh per HK$1 million revenue. • Water use rose to 3,935 m³ (+50.0% YoY) after office relocation and the commissioning of the Zero Carbon Smart Space. • Non-hazardous waste totalled 11,648.10 tonnes, mainly inert construction materials; hazardous office waste comprised 40 toner cartridges, 8 ink cartridges and 18 electronic units. • Environmental targets: maintain or lower intensity for GHG, energy, water and waste within five years versus 2024/25 baseline.

Green-finance and decarbonisation initiatives • Secured Hong Kong’s first HK$20 million green loan dedicated to noise-mitigating, low-emission equipment; HK$7.10 million utilised during the year to purchase 66 QPME-compliant electric units (3 electric light trucks, 63 generator sets), cutting generator noise by up to 15 dB. • Formed the “Zero Carbon Smart Alliance” with CATL, SANY and others, and opened the 4,500 m² Zero Carbon Smart Space demonstration base in Yuen Long. The on-site PV-storage-charging-swapping system generated 17,016 kWh, all exported to the grid under Hong Kong’s Feed-in Tariff scheme. • Deployed 14 new energy vehicles and continued electrification of construction machinery.

Health & safety • No work-related fatalities for the third consecutive year; 3 injuries led to 164 lost working days. • 4S Smart Site Safety System rolled out across all projects, providing real-time AI monitoring of worker vitals, equipment status and site hazards.

Workforce & community • Headcount 362 (82% male); turnover 62.2% driven by project completions. • 90.9% of staff received training; average 1.1 hours per employee. • Donated HK$60,000 to local charities and maintained “Caring Company” status for a sixth year.

Looking ahead, Wing Lee Dev targets continued reductions in carbon and resource intensities, broader deployment of electric equipment and deeper integration of climate metrics into risk management.

Disclaimer: Investing carries risk. This is not financial advice. The above content should not be regarded as an offer, recommendation, or solicitation on acquiring or disposing of any financial products, any associated discussions, comments, or posts by author or other users should not be considered as such either. It is solely for general information purpose only, which does not consider your own investment objectives, financial situations or needs. TTM assumes no responsibility or warranty for the accuracy and completeness of the information, investors should do their own research and may seek professional advice before investing.